摘要
我国电网规划环境影响评价工作正处在起步阶段,缺乏成熟的理论方法和指标体系。结合常州市"十二五"电网发展规划环境影响评价工作,探讨了电网规划环评中存在的难点和问题并提出了相应的对策建议。
Lacking of mature theoretical means and index systems,the research of Environmental Impact Assessment(EIA) of power grid planning in China is still in its beginning stage.In this research,combined with the working of EIA about Changzhou the 12 th five-year grid development planning,some existing difficulties and problems about the EIA of power grid planning were discussed and the corresponding suggestions were proposed at the same time.
出处
《电力科技与环保》
2014年第6期5-7,共3页
Electric Power Technology and Environmental Protection
关键词
电网规划
环境影响评价
难点
建议
指标体系
power grid planning
environmental impact assessment
difficulties
suggestions
index systems