期刊文献+

Slag/metal Separation Process of Gas-reduced Oolitic High-phosphorus Iron Ore Fines 被引量:2

Slag/metal Separation Process of Gas-reduced Oolitic High-phosphorus Iron Ore Fines
原文传递
导出
摘要 Slag/metal separation process of the highly reduced oolitic high-phosphorus iron ore fines was investigated. Samples were prepared using the reduced ore fines (metallization rate: 88%) and powder additives of CaO and Na2CO3. Slag/metal separation behavior tests were conducted using a quenching method and the obtained metal parts were subjected to direct observation as well as microstructure examination with SEM and EDS; iron recovery and phosphorus distribution tests were conducted using a Si-Mo high temperature furnace and the obtained metal parts were examined by ICP-AES analysis and mass measurement. Thermodynamic calculation using coexistence theory of slag structure was also performed. Results show that temperature for slag/metal separation must be higher than 1823 K and a satisfying slag/metal separation of the highly reduced ore fines needs at least 4 min; phosphorus con- tent of hot metal is mainly determined by thermodynamics; temperature of 1823-1873 K and Na2CO3 mixing ratio of about 3 % are adequate for controlling phosphorus content to be less than 0.3 mass% in hot metal; temperature, time and Na2CO3 mixing ratio do not have significant effect on iron recovery, and iron recovery rate could be higher than 80% as long as a good slag/metal separation result is obtained. Slag/metal separation process of the highly reduced oolitic high-phosphorus iron ore fines was investigated. Samples were prepared using the reduced ore fines (metallization rate: 88%) and powder additives of CaO and Na2CO3. Slag/metal separation behavior tests were conducted using a quenching method and the obtained metal parts were subjected to direct observation as well as microstructure examination with SEM and EDS; iron recovery and phosphorus distribution tests were conducted using a Si-Mo high temperature furnace and the obtained metal parts were examined by ICP-AES analysis and mass measurement. Thermodynamic calculation using coexistence theory of slag structure was also performed. Results show that temperature for slag/metal separation must be higher than 1823 K and a satisfying slag/metal separation of the highly reduced ore fines needs at least 4 min; phosphorus con- tent of hot metal is mainly determined by thermodynamics; temperature of 1823-1873 K and Na2CO3 mixing ratio of about 3 % are adequate for controlling phosphorus content to be less than 0.3 mass% in hot metal; temperature, time and Na2CO3 mixing ratio do not have significant effect on iron recovery, and iron recovery rate could be higher than 80% as long as a good slag/metal separation result is obtained.
出处 《Journal of Iron and Steel Research(International)》 SCIE EI CAS CSCD 2014年第11期1009-1015,共7页 钢铁研究学报(英文版)
基金 Item Sponsored by National Natural Science Foundation of China(51144010) Research Funds from State Key Laboratory of Advanced Metallurgy USTB of China(416020020)
关键词 oolitic high-phosphorus iron ore fine slag/metal separation iron recovery phosphorus partition oolitic high-phosphorus iron ore fine slag/metal separation iron recovery phosphorus partition
  • 相关文献

参考文献12

  • 1J. R. Zhang, L K. Hu, Y.Y. Liang, H.P. Yang, D. Sun, Chin. Min. J. 16 (2007) 74-76.
  • 2L.J. He, F. R. Hu, Min. MetaI1. 9 (2009) 31 -35.
  • 3J. Liu, G.Q. Li, C. Y. Zhu. A.C. Wang, J. Mater. MetalL 6 (2007) 173-179.
  • 4C. Y. Xu, T. C. Sun, C. Y. Qi, Y. L. Li, X. L. Mo, D. W. Yan,Z.X. Li, B.L. Xin, Trans. Nonferrous Met. Soc. Chin. 22 (2012) 2806-2812.
  • 5H. Q. Tang, Z.C. Guo, Z. L. Zhao, J. Iron Steel Res. Int. 17 (2010) No. 9, 1- 6.
  • 6H. Q. Tang, J. W. Wang, Z. C. Guo, T. Ou, J. Iron Steel Res. Int. 20 (2013) No. 5, 24-29.
  • 7T. Morita, M. Fnjii, Trans. ISIJ Int. 21 (1981) 732- 744.
  • 8K. Harashima, M. Matsuo, S. Mizoguchi, Trans. ISIJ 28 (1988) 172- 178.
  • 9C. Nassaralla, R. J. Fruehan, D.J. Min, Metall. Trans. B 22 (1991) 33 -38.
  • 10H. B. Zhang, L. Y. Dong, D. F. Chen, F. S. Zhen, C. S. Sun, Chin. J. Process Eng. 9 (2009) 137- 141.

同被引文献30

引证文献2

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部