摘要 针对制造系统多品种小批量生产模式下物流瓶颈转移的复杂问题,在对排队网络理论进行深入研究的基础上,建立了不同工站利用率和生产负荷的关系,并针对两类工件和四个工站的排队网络,对生产物流瓶颈转移趋势进行了分析,提出了用MVA近似分析法推算生产物流瓶颈的方法,该方法可以较好地计算瓶颈转折点的数值,能够有效处理生产物流瓶颈转移问题,为提高制造企业生产物流瓶颈管理水平创造了条件。 In this paper, in view of the complexity in removing the logistics bottlenecks in the multi-variety small-batch production system and on the basis of an in-depth analysis of the queue network theory, we established the relationship between the production load and utility rate of different workstations, then in view of the queue network involving two types of work pieces and four workstations, analyzed the trend of the relocation of the bottlenecks in the production logistics system and at last proposed the MVA method to deduct the bottleneck removing process.
作者 张仕军
出处 《物流技术》 北大核心 2014年第11期417-419,共3页 Logistics Technology
基金 2014年度浙江省教育厅科研项目资助(Y201432534) 2014年度浙江省自然科学基金课题(LY14G020003)
关键词 制造企业 排队网络 生产物流瓶颈 转折点 manufacturing enterprise queue network production logistics bottleneck turning point
  • 相关文献

参考文献8

  • 1施文武,严洪森.知识化制造系统中生产瓶颈的分析方法[J].计算机集成制造系统,2006,12(2):271-279. 被引量:13
  • 2涂摹生.排队网络的建模及扰动分析[A].科学决策与系统工程一中国系统工程学会第六次年会论文集[C].2002.
  • 3刘存霞,吕文.Nio-Mora和Glazebrook条件及一类排队网络的稳定性[J].烟台大学学报(自然科学与工程版),2004,17(3):164-169. 被引量:1
  • 4吴清一,张伟,李苏剑.企业生产物流系统中的库存策略[A].中国机械工程学会物料搬运分会第四届学术年会论文集[C].2002.
  • 5吴洪民.遗传算法应用于现代生产物流系统优化[A].面向制造业的自动化与信息化技术创新设计的基础技术-2001年中国机械工程学会年会暨第九届全国特种加工学术年会论文集[C].2001.
  • 6黄海军,李毅.一个排队网络中的动态用户均衡出行路径与出行时间选择模型[A].Systems Engineering, Systems Science and Complexity Research-Proceeding of l lth Annual Conference of Systems Engi- neering Society of China[C].2000.
  • 7魏学业,张润彤,朱晓敏.在一个二阶排队网络中对两类不同顾客的模糊控制[J].系统工程理论与实践,2000,20(8):45-49. 被引量:2
  • 8Balbo G, Serazzi G.Asymptotic analysis of multiclass closed queueing networks:multiple bottlenecks[J].Performance Evaluation,1997,30(3): 115-152.

二级参考文献16

  • 1吕文,袁成桂,张汉君.一类具有两个工作站的重入排队网络的流体模型的稳定性[J].长沙铁道学院学报,2000,18(4):54-57. 被引量:1
  • 2MOSS H K,YU W B.Toward the estimation of bottleneck shiftiness in a manufacturing operation[J].Production and Inventory Management Journal,2000,40(2) :53-58.
  • 3ROSER C,NAKANO M,TANAKA M.Shifting bottleneck detection[A].Proceeedings of the 2002 Winter Simulation Conference[C].New York,NY,USA:IEEE,2002.1079 - 1086.
  • 4KUO C T,LIM J T,MEERKOV S M.Bottlenecks in serial production lines:a systems approach[A].Proceedings of the 35 th Conference on Decision and Control[C].Piscataway,NY,USA:IEEE,1996.2751-2756.
  • 5CHIANG S Y,KUO C T,MEERKOV S M.DT-bottleneeks in serial production lines:theory and application[J].IEEE Transaction Robotics and Automation,2000,5 (16):567 -580.
  • 6CHIANG S Y,KUO C T,MEERKOV S M.Bottlenecks inMarkovian production lines:a systems approach [J].IEEETransaction Robotics and Automation,1998,2 (14):352 - 359.
  • 7LI Jingshan,MEERKOV S M.Bottlenecks with respect to due -time performance in pull serial production lines[A].Proceedings of the 2000 IEEE International Conference on Robotics & Automation[C].Piscataway,NY,USA:Institute of Electrical and Electronics Engineers Inc.,2000.2635-2640.
  • 8HUANG Wenqi,YIN Aihua.An improved shifting bottleneck procedure for the job shop scheduling problem[J].Computers & Operations Research,2004,12(31):2093- 2110.
  • 9RAMUDHIN A,MARIER P.The generalized shifting bottle neck procedure [J].European Journal of Operational Research,1996,93(1):34-48.
  • 10Zhang R,JIntelligentand Fuzzy Systems,2000年,8期,27页

共引文献13

同被引文献9

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部