基于计算机仿真的钢铁企业生产车间天车作业优化 被引量:3

Optimization of Overhead Crane Activities in Steel Enterprise Production Workshops Based on Computer Simulation
下载PDF
导出
摘要 采用计算机循环仿真的方法,通过不断循环转换初始仿真模型和改良模型,利用多层次模糊标准找到优化解,并运用Agent技术定义了生产车间的仿真物流对象、仿真事件和逻辑。最后结合攀枝花新钢钒股份有限公司连铸车间的实例,证明了计算机仿真方法能够优化生产车间物流天车作业。 In this paper, using the computer cyclic simulation process and by continuously switching between the original simulation model and the improved model, we obtained the optimal solution through the multi-layered fuzzy standardization process, then defined the objects, events and logic of the logistics simulation of the production workshops, and at the end, through an empirical case of the continuous casting workshop of Panzhihua Xingangfan Stock Co., Ltd., demonstrated the effectiveness of the simulation method.
出处 《物流技术》 北大核心 2014年第11期420-422,共3页 Logistics Technology
基金 2013河北省社会科学发展研究课题(HB2013XHS06J)
关键词 计算机仿真 钢铁企业 天车作业优化 AGENT技术 computer simulation steel enterprise overhead crane operation optimization Agent technology
  • 相关文献

参考文献5

二级参考文献34

  • 1郑忠,何腊梅,高小强.炼钢生产物流系统仿真的细胞自动机模型[J].钢铁,2004,39(11):75-78. 被引量:17
  • 2徐乐.基于元胞自动机的钢厂天车调度仿真方法研究[D].重庆:重庆大学,2008.
  • 3JAIN A. S, MEERAN S. Deterministic job-shop scheduling: past, present and future [J]. European Journal of Operational Research, 1999, 113 (2): 390-434.
  • 4TANG L, LIU J, RONG A, et al. A review of planning and scheduling systems and methods for integrated steel production [ J ]. European Journal of Operational Research, 2001,133(1) :1-20.
  • 5TAMAKI H,MURAO H,KITAMURA S. Simulation- based optimization model and metaheuristic solution of multiple crane scheduling problems [C] // 2004 IEEE International Conference on Systems, Man and Cybernetics, October 10-13, 2004, The Hague, Netherlands. [S. l.]:IEEE,[2005-02-07]:1469-1472.
  • 6GE Y,YIN Y. Crane scheduling with time windows in circuit board production lines[J]. International Journal of Production Research, 1995,33 (5) : 1187-1199.
  • 7MATSUO H, SHANG J S, SULLIVAN R S. A crane scheduling problem in a computer-integrated manufacturing environment [J]. Management Science, 1991,37(5) : 159-172.
  • 8TANG L X, XIE X, LIU J Y. Scheduling of a single crane in batch annealing process [J]. Computer and Operational Research,2009,36(10) : 1853-2865.
  • 9JAIN S, CHAN S. Experiences with backward simulation based approach for lot release planning[C]// The 29^th Conference on Winter Simulation,December 7- 10, 1997, Atlanta, USA. New York: ACM Press: 773-780.
  • 10Liu H J, Dong J. Dispatching role selection using artificial neural networks for dynamic planning and scheduling [ J ]. Journal of Intelligent Manufacturing, 1996,7 (3) : 243 - 250.

共引文献44

同被引文献19

引证文献3

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部