期刊文献+

漳州港集装箱堆场设备资源仿真与优化 被引量:1

Simulation and Optimization of Container Yard Equipment Resources of Zhangzhou Harbor
下载PDF
导出
摘要 以福建省漳州港为例,运用Flexsim CT仿真软件对其港口集装箱堆场设备资源进行仿真建模与优化分析。首先调研分析漳州港集装箱堆场存在的问题,然后在其现有堆场规划的基础上进行仿真建模,接着仿真实验不同的设备配置方案,并对输出数据进行优化分析。研究表明,在一定作业量的前提下,合理的岸桥、集卡和场桥的数量配置可以极大地提高堆场中转量和利用率等指标,对漳州港实际业务操作具有直接的指导意义和应用价值,进而极大地提升了港口运作效率和核心竞争力。 In this paper, in the case of the Zhangzhou Harbor in Fujian, we used the software Flexsim CT to simulate and optimize the equipment resources of the container yard of the harbor and found that when challenged with certain activity volume, a reasonable deployment of quay cranes, container trucks and yard cranes could effectively increase the operational efficiency and core competitivity of the harbor.
出处 《物流技术》 北大核心 2014年第11期432-434,440,共4页 Logistics Technology
基金 国家统计科研计划重点项目(2012LZ037) 厦门市社会科学调研课题(厦社科联[2014]29号)
关键词 集装箱堆场 设备资源 优化分析 仿真建模 FLEXSIM CT container yard equipment resource optimization and analysis simulation and modeling Flexsim CT
  • 相关文献

参考文献5

  • 1Chao S,Lin Y.Evaluating advanced quay cranes in container terminals[J]. Transporlation Research Part E,2011,47:432-445.
  • 2Petering M E H,Muriy K G.Effeet of hloek length and yard crane de- ployment systems on overall performance at a seaport container trans- shipmenl lerminal[J].Compulers&Operalions Research.2009,36(5):1 711- 1 725.
  • 3王小变,韩晓龙.箱区长度对码头装卸效率影响的仿真分析[J].重庆交通大学学报(自然科学版),2012,31(3):521-524. 被引量:3
  • 4沙梅,周鑫,秦天保,余大勇,邱华磊.集装箱码头堆场布局优化与仿真研究[J].工业工程与管理,2013,18(2):24-30. 被引量:10
  • 5彭杨,吴承建.物流系统建模与仿真[M].杭州:浙江大学出版社,2009.

二级参考文献12

  • 1徐伟,王少梅.基于eM-Plant的集装箱码头布局规划仿真研究[J].港口装卸,2006(1):22-25. 被引量:11
  • 2杨军.减少集装箱码头堆场面积的策略探讨[J].物流科技,2007,30(6):96-97. 被引量:4
  • 3Wiese J, Suhl L, Kliewer N. Mathematical models and solution methods for optimal container terminal yard layout [J. OR Spectrum, 2010,32 (3) 427-452.
  • 4Petering M E H. Effect of block width and storage yard layout on marine container terminal performance [J. Transportation Research Part E, 2009,45 (4) : 92-95.
  • 5Kim K H. Evaluation of the number of rehandles in container yards [J]. Computers and Industrial Engineering, 1997,32 (4) 701-711.
  • 6Wei Yan,Youfang Huang,Junliang He. An investigation into dynamic yard crane deployment and comparisons between hill- climbing and best-first-search algorithms [J. International Journal of Computer Applications in Technology, 2008,56 (2) ; 154-164.
  • 7Yuri M. Simulation and planning of intermodal container terminal[J].Simulation,1998.107-116.
  • 8Maurizio B,Azedine B,Mohamed R. Object oriented model for container terminal distributed simulation[J].European Journal of Operational Research,2006.1731-1751.
  • 9Petering M E H,Murty K G. Effect of block length and yard crane deployment systems on overall performance at a seaport container transshipment terminal[J].Computers and Operations Research,2009,(05):1711-1725.doi:10.1016/j.cor.2008.04.007.
  • 10Caris A,Macharis C,Janssens G K. Network analysis of container barge transport in the port of Antwerp by means of simulation[J].Journal of Transport Geography,2011.125-133.

共引文献11

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部