天然气长输管道通过高填方规划道路区的整治设计 被引量:10

Rectification of long-distance pipelines buried under high filling planned roads
下载PDF
导出
摘要 通过高填方规划道路区的天然气长输管道,因受路基高填方沉降的影响,会导致管道力学形状发生变化,管道有可能出现局部应力集中,这将严重影响管道的运行安全。对于该类问题目前多采用建设保护涵的方式来解决,但保护涵施工困难,投资高且不满足地方政府道路施工工期的要求。为此,对高填方段管线应力进行分析,提出了整治措施并计算其安全合理性。结果表明,增大管道壁厚是可行的整改方案。进而应用ABAQUS有限元软件,用梁单元模拟管道,将管道上方的回填土视为荷载,管道下方的弹性地基模拟为均匀分布的弹簧,分析了管道的稳定性以及因规划道路高填方不均匀沉降引起的管道应力。通过应力云图可以看出,管道在沉降突变处出现了应力集中现象,如果对该区域的管道不采取合理的整治措施,管道将在运行时出现事故。ABAQUS有限元软件分析结果也表明,高填方区管道因不均匀沉降引起的应力,通过增大管道壁厚的整治方案最为经济、合理。但同时也指出,管线安全运行的根本保障还是避免管线路由敷设于高填方规划区内。 If a long-distance gas pipeline is unavoidably buried under a high filling planned road,the high fill subgrade setting will result in the change of the pipe's mechanical shape and the local stress concentration on the pipe,which will pose threats to the safe operation of the pipeline.Protection culverts are mostly considered to be a solution but with difficulty in construction,a high cost and inability to meet the requirements for the construction duration of the planned road project organized by the local government.In view of this,besides the scheme of increasing the pipe thickness,we analyzed the pipe's stability and the stress on the pipe caused by the uneven high fill setting by using the ABAQUS finite element software package,in which the pipe was simulated by the beam element,the backfill above the pipe by the stress load,and the elastic foundation underneath the pipe by the evenly-distributed spring.From the stress cloud charts,we can see the stress concentration on the pipe where a sudden change occurs in high fill setting; if without any reasonable measures taken,accidents will be inevitable in the end.The analysis results from the ABAQUS also show that the scheme of increasing the pipe thickness will be the most cost-effective and practical way to deal with the stress resulted from the uneven high fill setting above the pipe.To the best of a long-distance pipeline project,we suggest that the pipeline laying route should be avoided through the high hilling planned road as far as possible.
出处 《天然气工业》 EI CAS CSCD 北大核心 2014年第12期118-122,共5页 Natural Gas Industry
关键词 埋地管道 高填方 规划道路 沉降 应力分析 有限元 增大壁厚 保护涵 buried pipeline high filling planned road settlement stress analysis ABAQUS finite element protection culvert
  • 相关文献

参考文献12

二级参考文献25

  • 1袁一星,郭立杰.给水管道事故原因及其防治措施初探[J].给水排水,1994,20(1):49-51. 被引量:9
  • 2沈之基.给水管线的应力分析、爆管原因及对策[J].给水排水,1996,22(4):40-43. 被引量:16
  • 3梁炳文.弹塑性稳定理论[M].北京:国防工业出版社,1981..
  • 4皮特.兰德劳夫(丹麦) 贺平等(译).区域供热手册[M].哈尔滨:哈尔滨工程大学出版社,1998..
  • 5吴为义 张土乔.考虑基础差异沉降影响的管道纵向力学性状[A]..岩土力学与工程的理论及实践[C].上海:上海交通大学出版社,1999..
  • 6何维华.破管情况分析及防范措施[J].中国给水排水,1988,(1).
  • 7S.P铁木欣柯[美]著.弹性稳定理论[M].科学出版社,1965..
  • 8杜马什涅夫(苏联)编著 大连工学院化学生产机器及设备教研室译.化学生产机器及设备:上册[M].化学工业出版社,1957..
  • 9高惠瑛.受场地不均匀沉陷作用的埋地管线反应分析[D].哈尔滨:中国地震局工程力学研究所,1996.
  • 10高田至郎.土沉陷时聚氯乙烯管道力学性能的试验研究.[M]//地下管线抗震.候忠良主编.北京:学术书刊出版社,1990:204-214.

共引文献167

同被引文献67

引证文献10

二级引证文献27

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部