期刊文献+

HEARTWARMING STORIES DURING CONSTRUCTION OF THE LHASA-SHIGATSE RAILWAY

HEARTWARMING STORIES DURING CONSTRUCTION OF THE LHASA-SHIGATSE RAILWAY
下载PDF
导出
摘要 The Lhasa-Shigatse Railway took 4 years to build.In those 1,400 days,while solving the technical problems,the builders tried every means to help the Tibetan locals.As the saying goes,he who sows courtesy reaps friendship.Their genuine efforts won them real friends among the Tibetan locals.Lhabupu Township of The Lhasa-Shigatse Railway took 4 years to build. In those 1,400 days, while solving the technical problems, the builders tried every means to help the Tibetan locals. As the saying goes, he who sows courtesy reaps friendship. Their genuine efforts won them real friends among the Tibetan locals.
出处 《China's Tibet》 2014年第6期10-12,共3页 中国西藏(英文版)
关键词 故事 日喀则 西藏
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部