期刊文献+

TRAILBREAKERS ON THE SNOW HIGHLAND

TRAILBREAKERS ON THE SNOW HIGHLAND
下载PDF
导出
摘要 At 9 a.m.in the morning on August 16th,2014,Train K9821,loaded with the first passengers,arrived in Shigatse after nearly three hours of its westward journey from Lhasa.The QinghaiTibet Railway,also known honorably as"the Heaven Road",extends another 251 kilometers to one side of Mt.Qomolangma,ending At 9a.m. in the morning on August 16th, 2011., Train K0821, loaded with the first passengers, arrived in Shigatse after nearly three hours of its westward journey from Lhasa. The Qinghai- Tibet Railway, also known honorably as "the Heaven Road", extends another 251 kilometers to one side of Mt. Qomolangina, ending thehistorical idea that no train runs in southwestern Tibet. The travel time from Lhasa to Shigatse has now been shortened from four hours to about three. The main force undertaking the project of the Lhasa-Shigatse Railway has been the CRCC (China Railway Construction Corporation), which has solved three major world construction problems during the years the Qinghai-Tibet Railway was being built.
出处 《China's Tibet》 2014年第6期13-19,共7页 中国西藏(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部