提升式管柱输送机牵引力的研究与机构优化 被引量:5

The Research of Elevating Pipe Conveyor Traction Force and Mechanism Optimization
下载PDF
导出
摘要 针对提出的一种石油钻井平台使用的采用液压绞车驱动,钢丝绳牵引的提升式管柱输送机输运效率的问题,用Matlab软件对输送机工作时钢丝绳的受力变化情况进行了分析与研究,发现了在管柱和输送架同时提升过程中钢丝绳的受力有不同的变化规律,找出了输送机提升过程中存在的问题。通过增加辅助坡道和采用辅助支撑臂的机构优化,大大降低了输运过程中钢丝绳受力的最大变化幅度,有效的降低了液压绞车的功率,提高了提升式管柱输送机的输运效率。 For the transport efficiency problem of the elevating pipe conveyor for the use of oil drilling platform which is driven by a hydraulic winch and pulled by steel wire rope, based on Matlab software, changes of the steel wire rope load while pipe conveyor working will be analyzed and researched. Research shows the different change regularity of force on the wire rope in the process of string and transmission rack is being upgraded at the same time and finds out the existing problems of conveyor during lifiing process. The steel wire rope force will be reduced through mechanism optimization method, by adding auxiliary ramp and using the auxiliary supporting arm, which will effectively reduce the driving link power and greatly improve the transportation effwiency of elevating pipe conveyor.
出处 《机械设计与制造》 北大核心 2014年第12期155-158,共4页 Machinery Design & Manufacture
基金 国家863计划资助项目(2012AA09A203)
关键词 液压绞车 钢丝绳 管柱输送机 机构优化 输运效率 Hydraulic Winch Steel Wire Rope Pipe Conveyor Mechanism Optimization Transportation Efficiency
  • 相关文献

参考文献11

二级参考文献26

  • 1张锋锋.提高岸边集装箱起重机钢丝绳使用寿命的分析[J].起重运输机械,2011(S1):55-58. 被引量:5
  • 2蒋泉山.垂直线提升机构的设计研究[J].林业机械与木工设备,2006,34(2):33-35. 被引量:3
  • 3张义民,贺向东,刘巧伶,闻邦椿.不完全概率信息条件下车辆零部件可靠性灵敏度设计[J].兵工学报,2006,27(4):608-612. 被引量:12
  • 4JOLICOEUR C, CARDOU A. A numerical comparison of current mathematical models of twisted wire cables under axisymmetric loads[J]. J. Energy Resources and Technology, 1991, 113(2): 241-249.
  • 5JOLICOEUR C, CARDOU A. Semicontinuous mathematical for bending of multilayered wire strands[J]. Journal of Engineering Mechanics, 1996,122(4): 643-650.
  • 6PHILLIPS J W, COSTELLO G A. Analysis of wire ropes with internal-wire rope cores[J]. J. Appl. Mech., 1985, 52(3): 510-516.
  • 7JIANG W G, HENSHALL J L, WALTON J M. A concise finite element nodel for three-layered straight wire rope strand[J]. International Journal of Mechanical Sciences, 2000, 42(1): 63-86.
  • 8David,Reid,Vsrcointernational,Inc.Th Development of Drilling Rigs[R].Dallas:IADC/SPE Drilling Conference,1998.
  • 9Hawkins.Pick-up and Lay-down System and Method:US,6,994;505 B2[P].2006-02-07.
  • 10Archie W,Beeman.Pipe-Conveying Catwork:US,4,235,566[P].1980-11-25.

共引文献102

同被引文献25

引证文献5

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部