摘要
结合国外总承包10000t/d熟料线循环冷却系统的工程实例,概要介绍了循环冷冻水系统的选择、组成及设备选型;重点介绍了系统运行中发生的问题、产生问题的原因以及初步改造方案;同时对该系统实施进一步的技术改造,进行了工艺方案和控制方案的探讨。
Combined with the circulating cooling system example of the 10000 t/d clinker production line of a foreign general contracting engineering, introduced in brief the selection, composition and equipment of its circulating chilled water system, and stessed on the problems in running process, and the causes and preliminary alteration scheme, at the same time, for the further reconstruction,discussed the technology scheme and control plan.
出处
《水泥工程》
CAS
2014年第6期78-80,83,共4页
Cement Engineering
关键词
10000t/d熟料线
密闭式压力回流循环冷却水系统
循环冷冻水系统
补水
定压膨胀
系统改造
10000t/d clinker line
closed pressure backflow circulated cooling water system
circulating chilled water system
water re-plenishing
constant pressure expansion
system alteration