期刊文献+

谈后张预应力筋对大跨度连续刚构桥的影响性能

Effect of Prestressed Reinforcement on the Long Span Continuous Rigid Frame Bridge
下载PDF
导出
摘要 随着大跨度连续刚构桥的长期使用,桥梁不可避免会出现中跨开裂及挠度不断增加等问题。为了提高梁的使用寿命,增加后张预应力筋可以有效地增加主梁的预应力,并减小大跨度梁的挠度。同时,适当的张拉位置对于优化桥梁的应力分布及控制挠度的增加是非常重要的。论文结合工程实例,具体分析后张预应力筋不同位置(包括顶板、腹板和底板)对于主梁的应力及挠度的影响,并找出后张预应力筋的最佳位置。 The problems like cracking of the girder in the mid-span and the ever-increasing vertical deflection appear during the long term usage of the long-span continuous rigid-frame bridge. Post-tension tendon with reserved duct can increase the pre-stress of the main beam effectively, and decrease the long term span deflection in order to improve the performance ofthe girder. At the same time, the proper tension position is very crucial to optimise the stress distribution of the bridge and control the deflection increase. Combining with practical engineering, the authors analyze the influence of different positions of post-tension tendon ( including top-, web and bottom plate tendons) on the stress and deflection of the main beam, and find out the optimal position of post tendon.
作者 李伟芹
出处 《工程建设与设计》 2015年第1期116-117,120,共3页 Construction & Design for Engineering
关键词 连续刚构桥 长期性能 后张预应力筋 最优张拉位置 continuous rigid-frame bridge long term performance post tendon optimal tension position
  • 相关文献

参考文献3

二级参考文献7

  • 1周水兴 向中富.桥梁工程[M].重庆:重庆大学出版社,2001..
  • 2.GB 50026-93.工程测量规范[S].,1993..
  • 3陈永奇.工程测量学[M].北京:测绘出版社,1984..
  • 4刘成龙 张焕新 廖卓清 等.虎门大桥270 m连续刚构桥施工测量控制与挠度监测[A]..中国土木工程学会桥梁及结构工程学会第十二届年会[C].广州,1996.447-455.
  • 5范立础.预应力混凝土连续梁桥[M].北京:人民交通出版社,1987..
  • 6黄豪,沈成武,雷建平.一种连续变量的遗传算法[J].武汉交通科技大学学报,1999,23(2):123-126. 被引量:15
  • 7杨昀,向学建.下沙大桥上部成桥线形施工监控[J].华东公路,2003(5):17-20. 被引量:12

共引文献108

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部