期刊文献+

断层影响下合理煤柱尺寸留设数值模拟分析 被引量:9

Numerical simulation on rational size setting of coal pillar under influence of fault
下载PDF
导出
摘要 针对潘三矿1642(1)工作面回采受F24大型逆断层影响,利用FLAC3D软件研究留设不同尺寸断层煤柱情况下,应力场、位移场和塑性区演化规律,从而提出合理的断层煤柱留设尺寸。研究发现,随着煤柱的减小,应力集中区域逐渐向断层上盘转移;在断层影响下,顶板最大下沉位置发生在靠近断层一侧;当煤柱尺寸减小到一个临界值时,采空区上方塑性区发育高度会突然增大。留设合理的断层煤柱就是确保塑性区不与断层接触的情况下,尽量减小煤柱尺寸。 Aiming at the 1642(1) working face of Pansan Mine influenced by F24 large thrust fault,the evolution laws of stress field,displacement field and plastic zone under different sizes of fault pillar were studied by using FLAC3 Dsoftware,so as to put forward the rational setting size of fault coal pillar.It showed that,with the decrease of coal pillar,the stress concentration region gradually transfers to hanging side of fault.Under influence of fault,the location of roof maximum subsidence is near the fault;when the size of coal pillar reduces to a critical value,the height of plastic zone above goaf will suddenly increase.Setting rational fault pillar means make sure the plastic zone can't contact with fault,and then reduce the size of pillar.
出处 《中国安全生产科学技术》 CAS CSCD 2014年第11期27-33,共7页 Journal of Safety Science and Technology
基金 国家自然科学基金项目(51374013/51174005/51134012) 安徽省学术和技术带头人科研活动项目(DG073) 高等学校博士学科点专项科研基金(20133415110006/20123415130001)
关键词 断层煤柱 应力场 位移 塑性区 数值模拟 fault pillar stress field displacement plastic zone numerical simulation
  • 相关文献

参考文献13

二级参考文献89

共引文献737

同被引文献99

引证文献9

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部