3DURGAPRASAD P V, DUTTA B K, VAZE K K, etal. A centralized on - line monitoring system for damage assessmentof critical components of multiple thermal powerplant units [C] / /International Conference on Reliability,Safety & Hazar, 2010: 379 -385.
4CHIN H C. TON S C. An adaptive forecast - based chartfor Non - Gaussian processes monitoring: With applicationto equipment malfunctions detection in a thermal powerp lant[J]. IEEE Trans Control Syst Techno, 2011, 19(5 ) : 1245 -1250.