摘要
介绍了鞍钢1450冷连轧生产线卡罗赛尔卷取机的生产工艺和运行状况,重点讨论了卡罗赛尔卷取机的运行过程,并对卷取机控制过程中的逻辑程序进行了分析,自主开发了卷取机顺序控制程序。应用结果表明,轮盘旋转顺序设计满足工艺要求,控制效果良好,提高了冷连轧机轧制效率。
The production process and operation status of Carrousel coiler in 1450 mm continuous cold rolling production line of Angang is introduced. Particularly the operational process of Carrousel coiler is discussed emphatically and the logical program for controlling the coiling process of Carrousel coiler is also analyzed. Based on the analytical results the sequence control procedure for Carrousel coiler is developed independently. The application results show that the sequential design for the turbine disk can meet the requirements of the production technology and the control effect is so good that the rolling productivity of the continuous cold rolling production line is improved.
出处
《鞍钢技术》
CAS
2014年第6期27-30,共4页
Angang Technology
关键词
冷连轧机组
卡罗赛尔卷取机
顺序控制
continuous cold rolling mill train
Carrousel coiler
sequence control