摘要
乐昌峡水利枢纽拦河坝工程采用了翻模抹面施工技术连续施工,并通过调整外加剂掺量控制塌落度,成功地一次完成施工,且混凝土表面光滑平整、曲线优美,值得类似工程借鉴。
High barrage overflow surface shape is complex , with high-grade concrete , so the requirement of surface is flat and smooth, and no cracks .Double plaster mould construction technology of continuous construction is applied in this project .By adjusting the additive content control slump , the construction successfully has been completed by one-off, and the concrete surface is flat and smooth , with the beautiful curve , which is worthy of reference for the similar projects .
出处
《广东水利水电》
2014年第9期46-48,共3页
Guangdong Water Resources and Hydropower
关键词
乐昌峡拦河坝
溢流面
翻模抹面
施工技术
overflow surface
double plaster mould
construction technique