摘要
因现有的室内标准击实试验的数据处理大部分采用手绘法、样条曲线法或二次、三次多项式拟合法,手绘法和样条曲线法所绘出的曲线很难直接找到最值,对于二次、三次多项式拟合法常采用Excel,但Excel计算较粗略。针对以上问题,文中运用MATLAB中曲线拟合的功能,对工程中击实试验数据进行分析,以拟合曲线的残差图为依据,较准确地得到了最大干密度,并得出如下结论:击实曲线多项式的次数越高,所拟合的效果越好;另外击实数据的分布情况也将影响曲线拟合效果。
Because most of the existing indoor standard compaction test data processing adopts hand-painted method,the spline curve method or quadratic,cubic polynomial fitting.It is difficult to find the most value directly form the curves of Hand-painted method and spline curve method.Excellis of-ten used in quadratic and cubic polynomial fitting method,but it is a rough calculation.In order to solve above problems,the MATLAB curve fitting functions is used in this paper to analysis the com-paction test data in engineering,and based on the residuals graph of fitting curve,the maximum dry density is got accurately.The conclusions are as follows:the higher a polynomial degree of the com-paction curve is,the better fitting effect would be;and the distribution of the compaction data also will affect the result of curve fitting.
出处
《交通科技》
2014年第6期113-116,共4页
Transportation Science & Technology
关键词
击实试验
曲线拟合
残差图
compaction test
curve fitting
residual figure