摘要 为了降低电网能耗,为其设备优化升级提供指导,以电网主要设备为研究对象,建立了能效综合评估算法。首先分析电网设备能效影响因素,建立设备能效模型,从单类设备综合损耗率与单台设备损耗率严重超标台数率两个方面挖掘能效指标并给出指标计算方法。考虑到各指标对能效影响的重要程度是多方面的,建立递阶层次结构模型,采用层次分析法计算指标的权重值,同时采用模糊综合评价法计算指标的能效量化分值,以克服其模糊性。采用所建立的算法对某电网的主要设备进行能效分析评估,结果表明了该方法的实用性和有效性。 In order to reduce energy consumption of power grid and provide guidance for its equipment optimizing and upgrading, energy efficiency synthesis evaluation algorithm is established for main equipments in the power grid,. Firstly, the energy efficiency influence factors of power grid equipments is analyzed and energy efficiency model for the equipments is established. Energy efficiency indexe calculation method is proposed by analyzing energy efficiency indexes from two aspects- synthesis loss rate of single class equipment and amount rate of equipment whose loss rate exceeds standard badly. Consider- ing various influence of energy efficiency indexes to energy efficiency and their different importance, hierarchical structural model is established and analytic hierarchy process is used to calculate importance degree of indexes. Furthermore, fuzzy synthesis evaluation method is introduced to calculate energy efficiency quantitative score of indexs so as to overcome its fuzziness. Finally, the proposed algorithm is applied to energy efficiency evaluation for main equipments in a power grid. The results show the practicability and availability of the proposed method.
出处 《计算技术与自动化》 2014年第4期84-88,共5页 Computing Technology and Automation
基金 国家自然科学基金资助项目(61472128)
关键词 电网设备 能效评估 层次分析法 模糊综合评价法 power grid equipment energy efficiency evaluation analytic hierarchy process fuzzy synthesis evaluation method
  • 相关文献

参考文献16

二级参考文献46

  • 1高慧.配电网的网损计算与降损措施分析[J].湖南电力,2004,24(5):40-42. 被引量:4
  • 2孙瑛,陈广桐.模糊数学方法在湖泊水质评价中的应用[J].山东工业大学学报,1994,24(2):154-158. 被引量:35
  • 3何文旭.配电网三相不平衡运行对线损的影响[J].重庆电力高等专科学校学报,2006,11(2):5-7. 被引量:6
  • 4[3]MIRABEDINI H,GORJI A. The sort of fault diagnosis in large synchronous generators by analytic hierarchy process(AHP)method[A]. Canadian Conference on Electrical and Computer Engineering [ C ]. Canada: [s.n. ],2001. 715-718.
  • 5[9]FARGHAL S A,KANDIL M S,ELMITWALLY A. Quantifying electric power quality via fuzzy modeling and analytic hierarchy processing[J]. IEE Proceedings on Generation, Transmission and Distribution, 2002,149(1):44-49.
  • 6GB50613-2010城市配电网规划设计规范[S].2010.
  • 7张力平.电网调度员培训模拟(DTS)[M].北京:中国电力出版社,1998..
  • 8Bee-Hua Gob. Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: The case of the Singapore residential sector [J]. Construction Management and Economics,2000, 18(2): 209- 217.
  • 9Dimitri Val, Fiodor Bljuger, David Yankelevsky. Reliability evaluation in nonlinear analysis of reinforced concrete structures [J].Structure Safety, 1997, 19(2): 203-217.
  • 10HUB G, Mann G K I, Gosine R G. Control curve design for nonlinear (or fuzzy) proportional actions using spline-based functions[J]. Automatica, 1998, 34(9): 1125- 1133.

共引文献334

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部