期刊文献+

高应变动力试桩技术的现存问题与改进方向 被引量:5

Existing Problems and Improvement Direction of High-strain Dynamic Testing Technique to the Testing of Pile
下载PDF
导出
摘要 作为一种简便、经济,同时相对精确的检测方法,高应变检测技术在房屋建筑、市政桥梁、港口水工等工程的基桩承载力、完整性检测及打桩监测中得到了广泛地应用,但是无论是仪器设备等硬件抑或是信号采集、数据分析等软件,仍然存在许多局限性与不足。为了改进检测方法,提高准确度,从多个方面介绍了高应变检测技术的现存问题与改进方向,以期推动该项技术的进一步完善。 As a simple, cheap,and relatively accurate method,high-strain testing technique to the testing of pile has been generally accepted and widely implemented. However,there are still many limitations and shortcomings no matter in hardware and in software. In order to promote development and perfection,give better service to the construction requirements, based on thorough analysis, the latest developments in technology are introduced by author through extensive investigation at home and abroad.
出处 《岩土工程技术》 2014年第6期283-286,共4页 Geotechnical Engineering Technique
关键词 承载力 完整性 高应变检测技术 现存问题 改进方向 pile capacity pile integrity high-strain testing technique existing problems improvement direction
  • 相关文献

参考文献3

  • 1建设部行业标准.JGJ106-2003建筑基桩检测技术规范[S].北京:中国建筑工业出版社,2003.
  • 2陈建荣,高飞,郑小勇.建设工程基桩检测技术问答[M].上海:上海科学技术出版社,2010.
  • 3广东省地方标准.DBJ15-60-2008建筑地基基础检测规范[S].北京;中国建筑工业出版社,2008.

共引文献8

同被引文献22

引证文献5

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部