摘要
核电厂建安和调试移交中,两大组织高度交叉作业,面临较高的安全和质量风险.因此,在移交过程中,应根据边界控制的要求和管理特点;严格执行移交过程中边界控制的措施、方法和手段,确保建安和调试交叉作业在安全可控的范围内有序开展,可为核电站同类型工作提供借鉴.
In the transferring and debugging of the nuclear plant, the tough cross-operation faces a high risk in safety and quality. Therefore, in the process of transferring, it is required to act on according to the control and management regula- tions of processing control. The measures and approaches should be strictly carried out in handover process, therefore to en- sure the installment and cross-operation in a safe and controllable range, which can provide reference for nuclear plant of the same kind.
出处
《浙江水利水电学院学报》
2014年第3期56-58,共3页
Journal of Zhejiang University of Water Resources and Electric Power
关键词
核电厂
安装
调试
移交
边界控制
nuclear plant
installment
debugging
transferring
processing control