摘要
复杂山区铁路选线是一项综合性的工作,需要综合考虑当地工程条件、地质环境、沿线控制因素等方面进行方案比选以降低工程造价,保证设计质量。鉴于此,研究了晋煤太钢铁路专用线接轨方案和线路尾端的走向方案。重点分析了晋煤太钢铁路专用线南侧加股道和北侧加股道接轨方案,尾端隧道方案、靠近厂区方案、并行车赶运销铁路专用线方案3种线路走向方案,提出了山区选线需要注意的几个问题,可为同类地区铁路选线提供参考。
Complex mountainous railway line selection is a comprehensive work. In order to ensure the quality of design and reduce the project cost the local engineering conditions, geological environment and controlling factors along the railway should be considered. Given this, the joint scheme and ending towards scheme of Jinmei Private Railway Dedicated Line were studied. The north and south track connection scheme, tunnel ending towards scheme, factory-nearby scheme and concurrent Chegan private railway scheme were mainly analyzed. The several problems needing attention in mountainous line selection were put forward, which can provide reference for railway line selection in similar regions.
出处
《交通标准化》
2014年第23期183-186,189,共5页
Communications Standardization
关键词
铁路选线
专用线
方案对比
接轨
railway line selection
dedicated line
scheme comparison
rail joint track