摘要 为了考察SBS改性沥青生产过程中剪切时间、剪切温度、剪切速率对SBS改性沥青性能的影响,采用ESS090号沥青为基质沥青,4303SBS为改性剂进行试验研究。结果表明:剪切时间与SBS改性沥青的量有关,一般在45min至2h,剪切温度在170-175℃,剪切速率为6000r/min,此时,SBS改性沥青的路用性能指标最佳。 In order to investigate the effect of shearing time, shearing temperature, shearing rate on properties of SBS modified asphalt in the production process, the test was carried with No. 90 ESSO matrix asphalt and 4303 SBS modifier. The results showed that the shearing time related to the quality of SBS modified asphalt, generally varying from 45 minutes to 2 hours, shearing temperature was between 170 ℃ to 175℃, and the shearing rate was 6000 revolutions per minute. If so, the pavement performance index of SBS modified asphalt was best.
出处 《石油沥青》 2014年第6期15-19,共5页 Petroleum Asphalt
关键词 SBS改性沥青 生产工艺 剪切时间 剪切温度 剪切速率 SBS modified asphalt production process shearing time shearing temperature shearingrate
  • 相关文献

参考文献5

二级参考文献8

  • 1丛玉凤,廖克俭,翟玉春.辽曙道路沥青感温性的评价[J].辽宁石油化工大学学报,2004,24(4):15-18. 被引量:5
  • 2JTG F40- 2004.公路沥青路面施工技术规范[s].,2004..
  • 3Milton M L. Improved properties of polystyrene - modified asphalt[ J ]. Petroleum science and technology, 1997,2 ( 1 &2 ) :471.
  • 4Brule. Paving asphalt blenders relationship between composition and properties[ J ]. Polymer testing, 1987,21 (3) : 856 - 871.
  • 5Nahas. Modified asphalt for high performance hot mix pavement blends[ J ]. Construction and buildy materials, 1991, 60 ( 1 ):911.
  • 6JTJF40-2003公路改性沥青路面施工技术规范[S].
  • 7陈龙智,黄卫东.改性沥青软化点影响因素的研究[J].石油沥青,2001,15(1):33-34. 被引量:6
  • 8陈惠敏.我国沥青生产形势和品种结构调整[J].石油沥青,2003,17(1):1-6. 被引量:2

共引文献25

同被引文献12

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部