积石峡水电站混凝土面板堆石坝监测设计 被引量:1

Monitoring Design of Concrete Face Rockfill Dam,JIshixia Hydropower Station
下载PDF
导出
摘要 积石峡水电站混凝土面板堆石坝监测系统在设计中充分考虑了工程特点和地质、地形条件,取得了完整的大坝竖向位移、台阶状的复式地形基础堆石体之间相对变形等资料,为层状岩基、不对称基础混凝土面板堆石坝安全监测积累了成功经验,具有较广泛的推广价值。 In the monitoring design of CFRD, Jishixia Hydropower Project, the engineering features, geological and topographic conditions are considered.Therefore, data such as the complete vertical displacement of the dam, the relative deformation between the foundation rockfill bodies on the compound topography in step are obtained.Those accumulate the experience on the safety monitoring design of the CFRD with layer rock foundation and asymmetric foundation.It is worth of widely being developed.
出处 《西北水电》 2014年第6期38-42,共5页 Northwest Hydropower
关键词 面板堆石坝 监测 沉降管 弯曲式埋设法 多联式位移计 压性缝 CFRD monitoring settlement tube bending installation method multiple displacement sensor compressive joint
  • 相关文献

参考文献6

二级参考文献9

  • 1颜义忠.高面板坝安全监测问题的探讨[M].北京:中国水利水电出版社,2010.
  • 2中国水利水电研究院.黄河积石峡水电站混凝土面板堆石坝坝体三维非线性有限元静力计算分析[R].2010.
  • 3中国水电顾问集团西北勘测设计研究院纽工程下闸蓄水验收设计报告[R].2010.
  • 4中国水电顾问集团西北勘测设计研究院程蓄水安全鉴定设计自检报告[R].2010.
  • 5SL60-94.土石坝安全监测技术规范[S].[S].,..
  • 6水利部,SL169-96 土石坝安全监测资料整编规程[S].
  • 7昆明勘测设计研究院.马鹿塘水电站二期工程安全监测仪器设备安装埋设及施工期监测技术要求(第A版)[R].昆明:昆明勘测设计研究院,2007.
  • 8徐泽平,邓刚.高面板堆石坝的技术进展及超高面板堆石坝关键技术问题探讨[J].水利学报,2008,39(10):1226-1234. 被引量:50
  • 9雷艳,王康柱,蔡新合.积石峡水电站混凝土面板堆石坝坝体分区优化设计及坝料调整[J].西北水电,2011(2):19-23. 被引量:8

共引文献12

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部