期刊文献+

聚氯乙烯生产过程全流程调度 被引量:2

Integrated scheduling for polyvinyl chloride productive processes
下载PDF
导出
摘要 研究了电石法制聚氯乙烯(PVC)全流程生产调度问题,包括从电石生产、盐水电解到氯乙烯(VCM)聚合产品出厂各环节,其中电石生产和VCM聚合是间歇过程,其他生产环节是连续过程,是一个混杂系统调度问题。本文针对过程特性对该问题进行了合理假设,以包括电耗、库存、产品型号切换、交货延迟等的成本最小为目标,建立了基于离散时间表示的混合整数线性规划(MILP)调度优化模型,并针对一个案例进行了调度优化求解和分析,验证了模型的可行性。 The overall process scheduling problem of polyvinyl chloride (PVC) production by calcium carbide method is studied in this paper, which is a hybrid system involving all production sections from calcium carbide production process and brine electrolysis process to polymerization of vinyl chloride (VCM). Calcium carbide production and VCM polymerization are batch processes, while other processes are continuous ones. Two hypothesis are made based on the process characters. Then the cost of electricity consumption, inventory, changeover and delivery delay is considered as an optimization objection, and the mixed integer linear programming (MILP) model of scheduling is constructed. The model is validated by a case of a PVC plant and comparing with the model with constant productivities of continuous stages.
出处 《化工学报》 EI CAS CSCD 北大核心 2015年第1期251-258,共8页 CIESC Journal
基金 国家高技术研究发展计划项目(2013AA040702) 国家自然科学基金项目(61273039)~~
关键词 聚合物 调度 全流程 模型 混杂系统 优化 polymers scheduling integrated process model hybrid system optimization
  • 相关文献

参考文献19

  • 1Yu Jiangzhong. Chronicle events of PVC market in 2013[EB/OL]. [2014-02]. http://www.sci99,com/n_44701.html.
  • 2王凌,周刚,许烨,金以慧.混合流水线调度研究进展[J].化工自动化及仪表,2011,38(1):1-8. 被引量:27
  • 3郑刚,谭民,宋永华.混杂系统的研究进展[J].控制与决策,2004,19(1):7-11. 被引量:58
  • 4Fanti Maria Pia, Iacobellis Giorgio, Mangini Agostino Marcello, Ukovich Walter. Freeway traffic modeling and control in a first-order hybrid petri net framework [J]. 1EEE Transactions on Automation Science and Engineering, 2014, 11(1): 90-102.
  • 5贾洋,肖武,董宏光.基于自组织Petri Net的间歇过程换热网络优化设计[J].化工学报,2010,61(12):3167-3171. 被引量:4
  • 6Chu Yunfei, You Fengqi. Integrated planning, scheduling, and dynamic optimization for batch processes: M1NLP model formulation and efficient solution methods via surrogate modeling [J]. Ind. Eng. Chem. Res., 2014, 53(34): 13391-13411.
  • 7Su Lijie, Tang Lixin. Unit-specific event based continuous-time formulation for scheduling hybrid process //Chinese Control and Decision Conference[C]. 2009.
  • 8Nie Yisu, Biegler Lorenz T, Villa Carlos M, Wassick John M. Discrete time formulation for the integration of scheduling and dynamic optimization [J]. lnd. Eng. Chem. Res., DOI: 10.1021/ie502960p.
  • 9Mockus L, Reklaitis G V. Continuous time representation approach to batch and continuous process scheduling ( I ): MINLP formulation [J].lnd. Eng. Chem. Res., 1999, 38:197-203.
  • 10Tang Qi, Zhang Qingshan. Research on the problem of scheduling multi-product batches in the process industry//The 26th Control and Decision Conference (2014 CCDC) [C].2014:2702-2707.

二级参考文献104

  • 1轩华,唐立新.实时无等待HFS调度的一种拉格朗日松弛算法[J].控制与决策,2006,21(4):376-380. 被引量:25
  • 2萧德云 莫以为.混合系统的验证与控制综合[A]..第21届中国控制会议论文集[C].杭州: 浙江大学出版社,2002.635-641.
  • 3Linnhoff B. Use pinch analysis to knock down capital costs and emissions. Chemical Engineering Progress, 1994, 90 (8) : 32- 57.
  • 4Linnhoff B, Ashton G J, Obeng g D A. Understanding process integration II.I. Chem. E. Syrup. Series, 1988, 109 : 221 -230.
  • 5Obeng E D A, Ashton G J. On pinch technology based procedures for the design of batch processes. Chemical Engineering Research & Design, 1988, 66 (3): 255-259.
  • 6Kemp I C, Deakin A W. The cascade analysis for energy and process integration of batch processes. Chemical Engineering Research & Design, 1989, 67 (5): 495-525.
  • 7Wang Y P , Smith R. Time pinch analysis. Chemical Engineering Research and Design, 1995, 73 (A):905-914.
  • 8Stoltze S, Mikkelsen J, Lorentzen B, Petersen P M, Qvale B. Waste heat recovery in batch processes using heat storage. Journal of Energy Resources Technology, 1995, 117 (2): 142-149.
  • 9Krummenacher P, Favrat D. Indirect and mixed direct- indirect heat integration of batch processes based on pinch analysis. Applied Thermodynamics, 2001, 3 ( 4 ): 135- 143.
  • 10Chen Cheng-Liang, Ciou Ying-Jyuan. Design and optimization of indirect energy storage systems for batch process plants. Ind. Eng. Chem. Res., 2008, 47 (14): 4817-4829.

共引文献87

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部