摘要
通过对某高填方地基的沉降变形进行分析,采用高压旋喷桩进行地基加固处理,提高了地基承载力,减小了建筑物的沉降,说明高压旋喷桩可以在高填方地基处理中应用,并取得了良好的加固效果,可为类似工程提供参考借鉴。
Through the settlement analysis of one high filled foundation, apply high pressure rotary jet grouting pile as ground improvement meas- ure. Which improved the ground bearing capacity, reduced the building settlement. Which shows that high pressure rotary jet grouting pile can be used in high filled foundation improvement, and received good results. It is also a good reference for other project.
出处
《山西建筑》
2015年第2期63-64,共2页
Shanxi Architecture
关键词
高填方
地基处理
高压旋喷桩
沉降变形
high fill, ground improvement, high pressure rotary jet grouting pile, settlement deformation