摘要
以某火车站候车大厅大跨度梁施工工程为例,对该项工程所采用的后张法有粘结预应力梁施工技术的具体工艺流程进行了论述,并总结了各施工环节应注意的事项,以供类似工程参考借鉴。
Taking some large-span beam construction project of some railway station' s waiting room as the example, the paper indicates factual craft procedure of the post-tensioning method prestressing beam with adhesion of the project, and sums up some precautions of different construc- tion steps, so as to provide some reference for similar projects.
出处
《山西建筑》
2015年第2期82-84,共3页
Shanxi Architecture
关键词
后张法
有粘结预应力
大跨度梁
预应力筋
波纹管
post-tensioning method, prestressing beam with adhesion, large-span beam, prestressed reinforcement, corrugated pipe