期刊文献+

六甲1#、2#机组水轮机顶盖排水系统改造 被引量:1

Turbine head cover drainage system modification for No.1 and No.2 units of Liujia Hydropower Station
下载PDF
导出
摘要 六甲水电站1#、2#机组原主轴密封均采用橡胶平板式密封方式,设备运行期间顶盖漏水量大,时常因抽水泵故障导致水淹水导轴承,针对这一问题对水轮机主轴密封型式和排水方式进行改造。改造后,节省排水能耗和检修费用,运行3年效果良好。 The main shaft sealing of No.1 and No.2 units of Liujia Hydropower Station was originally flat plate type rubber sealing. Too much leakage from turbine head cover had frequently lead to the turbine guide bearing was flooded due to pump failure. In view of this problem,main shaft sealing and drainage system were modified. Opera?tion of three years since the modification has demonstrate good effects with less pumping energy consumption and maintenance cost.
出处 《广西水利水电》 2014年第6期58-60,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 水轮机顶盖 排水系统 原理 改造 Turbine head cover drainage system principle modification