摘要 采用在门槽混凝土下游侧钻孔引流,将其表面封闭后进行聚氨酯灌浆材料封堵施工的方案,对江西峡江水利枢纽进水口检修闸门门槽二期混凝土进行渗漏治理,结果表明该施工方案防水效果良好,值得同类混凝土渗漏治理借鉴。 For the leakage treatment of the second phase concrete of the water inlet bulkhead gate slot of Xiajiang Hydro- junction project, first the downstream sides of the gate slot concrete was drilled for drainage; then polyurethane grout plugging was carried out after its surface was sealed. It turned out the waterproofing effect was good, and it was worth considering for similar concrete leakages treatments.
出处 《中国建筑防水》 2015年第1期33-35,共3页 China Building Waterproofing
关键词 水利枢纽 门槽混凝土 渗漏治理 灌浆 闭水试验 hydro-junction gate slot concrete leakage treatment 'grouting closed water test