以某钢厂加热炉建设为背景,从平面布置、设备结构及动作时序入手,对带有装钢机和出钢机的线棒材加热炉的设计要点进行了介绍,为类似项目的设计提供参考。
Introduces the key points of designing wire&rod reheating furnace with charging&discharging machine in one steel plant , such as layout, structures of equipment and action time sequence, in order to provide the similar items with reference design.
出处
《工业加热》
CAS
2014年第6期42-44,47,共4页
Industrial Heating
关键词
线棒材加热炉
装钢机
出钢机
平面布置
设备结构
动作时序
wire&amp
rod reheating furnace
charging machine
discharging machine
plane layout
structures of equipment
action time sequence