期刊文献+

一种基于虚拟节点网络拓朴结构适用于架空线路主动配电网的纵联保护方案 被引量:14

An aerial line active distribution network pilot protection scheme based on topology of virtual node
下载PDF
导出
摘要 为了解决主动配电网双向潮流对配电网保护影响,分析了DER接入对PDN保护带来的问题,提出了基于虚拟节点网络拓朴结构多分支线路纵联方向保护,适用于架空线路的配电自动化。基于虚拟节点网络拓朴结构的配电网纵联保护方案,采用EPON技术,利用EPON传输GOOSE机制、FTU传输启动及方向元件,由集中式纵联方向保护装置实现配电网的保护,能很好地满足ADN接入DG对保护的要求。设计开发了相应的FTU及集中式保护装置,应用在实际的ADN系统,实验测试了GOOSE上行、下行传输延时,保护动作时间。实验结果表明基于虚拟节点网络拓朴结构的纵联保护方案适用于ADN系统,具有很好的应用前景。 To solve the impact of active distribution network bi-directional current on distribution network protection, this paper analyzes the protection PDN problem of the DER access, and puts forward the multi-branch pilot directional protection scheme based on topology of virtual node, which is suitable for aerial line distribution automation. The protection scheme adopts EPON technology, uses GOOSE transmission of EPON, FTU transfer starting component and directional component, and realizes the distribution network protection by using centralized pilot directional protection, which can well solve those problems of DG access. We design FTU and centralized protection device used in the practical ADN system, and test the up and down transmission delay of GOOSE and accurate tripping time of the protection. The experimental results show that multi-branch pilot directional protection scheme based on topology of virtual node is suitable for ADN, and has good application prospect.
作者 李瑞生
出处 《电力系统保护与控制》 EI CSCD 北大核心 2015年第2期70-75,共6页 Power System Protection and Control
关键词 主动配电网 分布式发电 虚拟节点 架空配电自动化 集中式保护 active distribution network distributed generator virtual node aerial line distribution automation centralized protection
  • 相关文献

参考文献4

二级参考文献41

  • 1Clark G W. The need for technology and intelligence in the future power system[R]. Paris, France: CIGRE, 2010.
  • 2范明天.配电系统与分散发电集成研究的国际动态 CIGRE2008中C6的研究方向.动力和电力工程师,2008,(4):33-34.
  • 3Study Committee C6, Distribution Systems and Dispersed Generation. Strategic plan for the period 2007-2016[R]. Paris, France: CIGRE, 2007.
  • 4D'Adamo C, Jupe S, Abbey C. Global survey on planning and operation of active distribution networks: update of CIGRE C6.11 working group activities[C]//CIRED 2009(20th International Conference on Electricity Distribution). Prague, CZ: IET Services Ltd, 2009: 1-4.
  • 5Celli G, Ghiani E, Mocci S, et al. Reliability assessment of active distribution networks[C]//CIGRE 2010. Paris, France: Cigr6 Technical Committee, 2010: 1-9.
  • 6Pilo F, Celli G, Mocci S, et al. Multi-objective programming for optimal DG integration in active distribution systems[C]//Power and Energy Scociety General Meeting, 2010 IEEE:Minneapolis, MN, USA. IEEE, 2010: 1-7.
  • 7Celli G, Pilo F, Soma G G, et al. Active distribution network cost/benefit analysis with multi-objective programming [C]//CIRED 2009 (20th International Conference on Electricity Distribution). Prague, CZ: IET Services Ltd, 2009: 1-5.
  • 8Pilo F, Pisano G, energy resources management[J] . Electronics, 2011, Soma G G. Optimal coordination of with atwo-stage online active IEEE Transactions on Industrial 10(58): 4526-4537.
  • 9CeUi G, Mocci S, Pilo F. Multi-year optimal planning of active networks[C]//CIRED 2007 (19th International Conference on Electricity Distribution). Vienna, Austria: IET Services Ltd, 2007: 0690.
  • 10Pilo F, Pisano G, Soma G G. Advanced DMS to manage active distribution networks[C]//Power Tech, 2009 IEEE Bucharest. Bucharest, Romania: IEEE, 2009: 1-8.

共引文献367

同被引文献245

引证文献14

二级引证文献254

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部