期刊文献+

城市轨道交通联调探讨 被引量:2

Systems Integrated Commissioning for Urban Mass Transit
下载PDF
导出
摘要 城市轨道交通设备系统联调是指对车辆系统、供电系统、通信系统、信号系统、自动售检票系统、火灾报警系统、站场机电系统(包括屏蔽门、直扶梯、通风空调、给排水、照明)、综合监控系统等系统之间的综合联调和模拟城市轨道交通运行及其运营演练,并对整个系统进行评估。依据重庆市轨道交通一号线、三号线、六号线联调的实施经验,简要介绍城市轨道交通设备系统联调的特点、意义和主要实施内容。 The systems integrated commissioning for urban rail transit equipment is to carry out integrated commissioning and simulating operation of the systems such as vehicle, power supply, communication, signal, AFC, FAS, BAS(including PSD, elevator, air conditioning, water supply and drainage and lighting) and integrated supervision and control system etc., in order to evaluate the whole system. This paper introduces the characteristics, meaning and contents of the urban rail transit integrated commissioning according to implementation experience of Chongqing Line 1, Line 3 and Line 6.
出处 《铁路通信信号工程技术》 2014年第6期55-58,共4页 Railway Signalling & Communication Engineering
关键词 轨道交通 联调 模拟 urban rail transit integrated commissioning simulation
  • 相关文献

参考文献9

  • 1重庆市轨道交通一号线联调管理及服务》合同文件.
  • 2重庆市轨道交通三号线联调管理及服务》合同文件.
  • 3重庆市轨道交通六号线联调管理及服务》合同文件.
  • 4GB50578-2010城市轨道交通信号工程施工质量验收规范[S].
  • 5GB50641-2010跨座式单轨交通施工及验收规范[S].
  • 6GB/T50490-2009城市轨道交通技术规范[S].
  • 7GB/T50839-2013城市轨道交通工程安全控制技术规范[S].
  • 8GB/T 50328-2001建设工程文件归档整理规范[S].
  • 9GB/T50438-2007地铁运营安全评价标准[S].

共引文献47

同被引文献3

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部