摘要
采用风险因子法,对IBM V7000-2项目的开展过程,进行了技术风险评估分析,并针对可能出现的11种风险因素,提出应急措施和预防措施。
This paper adopts risk factor method to the process of the IBM V7000-2 project, which makes the technical risk as?sessment analysis, and proposes contingency measures and prevention measures to 11 possible occurrences of risk factors.
出处
《山西大同大学学报(自然科学版)》
2014年第6期6-9,73,共5页
Journal of Shanxi Datong University(Natural Science Edition)