摘要
压水堆堆芯换料系统是压水堆核电厂普遍采用的核燃料组件管理系统,该系统通过直观的图形化界面向燃料管理员展示核燃料厂房装载情况,并通过优化的算法生成堆芯换料组件移动步序,打印出组件移动单,用于现场实施。文章介绍了堆芯换料业务流程以及信息系统实现方案。
Pressurized water reactor refueling system is widely used by PWR nuclear power plant, the system shows intuitive graphical interface to the fuel operator and generates fuel assembly moving steps for reactor refueling by optimized algorithms, prints out the report of assembly moving steps for the implementation of assembly movement. This article describes the refueling business processes and implementation of information system.
出处
《中国核电》
2014年第4期372-377,共6页
China Nuclear Power
关键词
燃料组件
换料
大修
相关组件倒换
fuel assembly
refueling
overhaul
relevant exchange of assembly