期刊文献+

高速公路路面养护项目选择的经济模型 被引量:3

Economic Model for Selection of Expressway Pavement Maintenance Project
下载PDF
导出
摘要 分别以车辆出行成本节约与通行收入增加的总和最大及车辆出行广义费用最小作为上、下层模型的目标函数,构建高速公路路面养护项目选择的双层规划模型,在交通量动态分配的基础上采用搜索算法对模型进行求解,同时考虑养护路段施工难度、交通瓶颈、路段安全水平及路段重要度等因素综合判定最优养护方案。结果表明:定量计算与定性指标分析相结合能得出高速公路路面养护项目的最优选择方案,计算结果可反映路段养护的经济效益。 Bi‐level programming model is established for the optimal pavement maintenance project selection of expressway on the basis that the maximum of the sum of vehicle travel cost saving and toll income increasing and the minimum of vehicle travel generalized cost are made as the objective function of the upper level model and the lower level model respectively.Then the search algorithm based on dynamic traffic assignment is designed to solve the model.And expressway maintenance difficulty ,traffic bottleneck ,safety level and degree of expressway importance are combined to decide the optimal maintenance scheme.The results show that quantitative calculation combined with qualitative analysis could get the optimal scheme of expressway maintenance ,and reflect the economic benefit of expressway maintenance.
出处 《技术经济》 CSSCI 2014年第12期93-97,共5页 Journal of Technology Economics
基金 国家自然科学基金项目"异质化特性下交通-能源-环境演化机制与混合CGE模型及仿真"(51278057) 国家自然科学基金青年科学基金项目"基于运输组织的地面高速交通网络特征模拟与空间效应测度"(41301130) 中央高校基本科研业务费专项资金项目"陆路高速交通网络特征分析与空间经济效应"(2013G6234056)
关键词 高速公路 公路经济 项目选择 双层规划 出行成本 预算约束 expressway highway economics project selection bi-level programming travel cost budget constraint
  • 相关文献

参考文献15

  • 1王素君,姜万庆.高速公路资产运营评价与管理[M].北京:人民出版社,2010.4.
  • 2赵丽君,陆阳.公路养护资金分配的多目标模糊优化动态规划分析[J].交通运输工程与信息学报,2009,7(2):105-109. 被引量:6
  • 3FHWA.Pavement management system[R].Washington,D.C.:Federal Highway Administration,1991:43-46.
  • 4YANGFENG OUYANG,MADANAT S.Optimal scheduling of rehabilitation activities for multiple pavement facilities:exact and approximation solution[J].Transportation Research Part A,2004,38(5):347-365.
  • 5GEOFFROY D N,SHUFON J J.Network level pavement management in New York State:agoal-oriented approach[J].Transportation Research Record:Journal of the Transportation Research Board,1992,1344:57-65.
  • 6TENGJ-Y,TZENG G-H.A multiobjective programming approach for selecting non-independent transportation investment alternatives[J].Transportation Research Part B,1996,30(4):291-307.
  • 7LI Zongzhi,SINHA K C.A methodology for multicriteria decision making in highway asset management[J].Transportation Research Record:Journal of the Transportation Research Board,2004,1885(12):79-87.
  • 8DELA GARZA J M,DREW D R,CHASEY A D.Simulating highway infrastructure management policies[J].Journal of Engineering Management,1998,13(5):64-72.
  • 9SALEMO,ABOURIZK S,ARIARATNAM S.Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives[J].Journal of Infrastructure Systems,2003,9(1):6-15.
  • 10JHAM K,ABDULLAH J.A markovian approach for optimizing highway life-cycle with genetic algorithms by considering maintenance of roadside appurtenances[J].Journal of the Franklin Institute,2006,343(4/5):404-419.

二级参考文献7

共引文献16

同被引文献8

引证文献3

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部