期刊文献+

鞍钢钢绳厂生产污水处理的工艺设计及运行效果

Process for treating wastewater produced by Wire Rope Company and its effect
下载PDF
导出
摘要 本文介绍了鞍钢钢绳厂生产废水处理工艺,包括沉淀系统、气浮系统、砂滤罐过滤系统。通过试验确定p H为11时,沉淀系统对Zn2+的去除率达到98.4%。通过正交试验确定当PAC用量为20 mg/L、PAM用量为2 mg/L、p H 7.5、气浮压力为1.2 Mpa时气浮系统对钢绳厂废水中SS、石油类、COD的去除率分别达到90%、70%、70%。经过砂滤罐过滤系统后废水中的SS为20 mg/L、石油类为2 mg/L、COD为48 mg/L,其去除率分别达到94%、78%、80%。 The process for treating wastewater produced by Wire Rope Company of Angang Steel was introduced,which included precipitation system,air float system and filtration system of sand filter tank. Orthogonal and related experiments identified that the precipitation system could remove up to 98. 4% of Zn2+ when pH was set at 11;by air float system the removing rates of SS,oils and COD were up to 90%,70% and 70% when dosage of PAM and PAC were 20mg/L and 2mg/L,pH at 7. 5 and air pressure at 1. 2 MPa;Similarly by filtration system of sand filter tank the surplus of SS, oils and COD were respectively to be 20mg/L,2mg/L and 48mg/L,and the removal rates of them were up to 94%,78% and 80% in wastewater respectively.
出处 《环保科技》 2014年第6期53-56,共4页 Environmental Protection and Technology
关键词 生产废水 沉淀 气浮 砂滤罐过滤 wastewater precipitation air float filtration system of sand filter tank
  • 相关文献

参考文献3

二级参考文献12

共引文献129

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部