多资源约束项目计划内在稳健性度量方法研究(英文)

Intrinsic Robustness Measurement for Multi-resources Constrained Project Schedules
下载PDF
导出
摘要 项目计划的内在稳健性的优劣决定了该项目计划能否成功实施。项目计划的内在稳健性度量指标是识别和制定稳健性项目计划的重要依据。基于16种优先规则制定项目计划和优化关键序列和资源链接,用33种度量指标测度项目计划内在稳健性并与j30,j60的网络计划算例的仿真结果进行对比。仿真结果表明,在j30,j60的每组480个算例中,内在稳健性度量指标RM5在均值和标准差方面都有最好的表现。 Intrinsic robustness of a project schedule determines whether the project schedule can be executed successfully or not. Intrinsic robust measurement index of a project schedule is an important basis to identify and establish a robust project schedule. On the basis of project schedules established by 16 different priority rules, and critical sequences and resource links of the schedules optimized, 33 indices to measure intrinsic robustness were compared and the best intrinsic robust measurements were identified by simulation using j30 and j60 network instances designed by Kolisch (1997). Simulation results show that intrinsic robust index RM5 has the best performance both in the average and standard deviation among the 480 deviation values of the j30 and j60 network instances.
出处 《系统仿真学报》 CAS CSCD 北大核心 2014年第11期2655-2662,共8页 Journal of System Simulation
基金 Project research on intrinsic robustness under resource-constrained project scheduling(61064007,71062008,71263009) sponsored by National Natural Science Foundation of China and by SRF for ROCS,SEM
关键词 内在稳健性 稳健性指标 度量 多资源约束 项目计划 仿真 intrinsic robustness robust index measurement multi-resources constraints project schedule simulation.
  • 相关文献

参考文献22

  • 1J D Wiest. Some properties of schedules for large projects with limited resources [J]. Operations Research (S0030-364X) 1964, 12(3): 395-418.
  • 2Willy Herroelen, Bert De Reyck, Erik Demeulemeester. Resource-constrained project scheduling: A survey of recent developments [J]. Computers and Operations Research (S0305-0548), 1998, 25(4): 279-302.
  • 3Peter Brucker, Andreas Drexl, Roll Mfhring, Klaus Neumann, Erwin Pesch. project scheduling: notation, classification, models, and methods [J]. European Journal of Operational Research (S0377-2217), 1999, 112(1): 3-41.
  • 4Senke Hartmann, Rainer Kolisch. Experimental evaluation of state-of-the-art heuristics for resource constrained project scheduling [J]. European Journal for Operational Research (S0377-2217), 2000, 127(3): 394-407.
  • 5R Kolisch, R Padman. An integrated survey of deterministic project scheduling [J]. Omega (S0305-0483), 2001, 29(3): 249-272.
  • 6Willy Herroelen, Erik Demeulemeester, Bert De Reyck. A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods by Bracket, et al. [J]. European Journal of Operatienal Research (S0377-2217), 2001, 128(3): 679-688.
  • 7Willy Herroelen, Roel Leus. Robust and reactive project scheduling: a review and classification of procedures [J]. International Journal of Production Research (S0020-7543), 2004, 42(8): 1599-1620.
  • 8M A A1-Fawzan, Mohamed Haouari. A bi-objective model for robust project scheduling [J]. International Journal of Production Economics (S0925-5273), 2005, 96(2): 175-187.
  • 9Stijn Van de Vonder, Erik Demeulemeester, Willy Hen'oMen, Roel Lens. The trade-off between stability and makespan ha resource-constrained project scheduling [J]. International Journal of Production Research (S0020-7543), 2006, 44(2): 215-236.
  • 10Goldratt E M. Critical Chain [M]. Great Barrington, Ma, USA: The North River Press Publishing Corporation, 1997.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部