急倾斜走向长壁工作面综采设备快速安装技术 被引量:8

Rapid Installation Technology of Fully Mechanized Mining Equipment in Steeply Inclined Longwall Face Along Strike
下载PDF
导出
摘要 针对急倾斜走向长壁工作面综采设备安装因煤层倾角大,钢梁起吊工艺复杂、适应条件苛刻,平板车装运易引发平板车下道或设备倾倒等问题,通过在切眼内安设滑道,上口浇筑转运平台,采用绞车控速、滑靴导向、设备横向自溜下放的安装技术,保证了综采设备平稳运输提高安全系数的同时减少了起吊装卸工序所需人员和工时,加快了安装速度,降低了劳动强度和安装成本。 Aiming at the problems in fully mechanized coal mining equipment installation in steeply inclined longwall working face along strike,such as complicated steel girder hoisting process and harsh adaption conditions,flat car derail and equipment rollover.Slideway was installed in open- off,transport platform was built upper,and winch speed control,piston shoes guide and horizontal self- slip of the equipment were applied,to ensure smooth transportation and improve the safety coefficient,simplify the process and reduce personnel and man hour,accelerating installation speed and reducing labor intensity and the cost.
出处 《煤炭工程》 北大核心 2015年第1期44-46,共3页 Coal Engineering
关键词 急倾斜煤层 走向长壁 综采设备 快速安装 steeply inclined coal seam longwall along strike fully mechanized equipment rapid installation
  • 相关文献

参考文献6

二级参考文献24

共引文献54

同被引文献34

引证文献8

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部