从一起直流接地故障探析大型厂站直流系统运行 被引量:1

Discussion of DC system operation for large station based on a DC grounding fault
下载PDF
导出
摘要 通过对一起直流系统瞬时接地故障的分析,指出由于寄生回路的存在,导致两套完全独立的直流系统微机绝缘监测装置同时误报接地故障;大型厂站内大量微机型绝缘监测装置、静态型保护装置、滤波回路及长电缆等设备的广泛使用,使得直流系统运行面临很多新问题;对新形势下大型厂站的直流系统运行进行了探讨。 Based on the analysis of an instantaneous direct current(DC) system ground fault, it is found that the parasitic circuit brings about the ground fault in two completely independent DC system simultaneously. The wide use of devices such as microprocessor-based insulation monitoring device, static type protection device, filtering circuit, long cables and so on in large plant station makes DC system operation have some new problems. The operation of large-scale plant station with DC system under the new situation is discussed.
作者 徐鹏
机构地区 龙滩水力发电厂
出处 《水电站机电技术》 2015年第1期18-20,78,共3页 Mechanical & Electrical Technique of Hydropower Station
关键词 直流系统 瞬时接地 绝缘监测装置 等效电容 DC system ground fault insulation monitoring device equivalent capacitance
  • 相关文献

参考文献2

  • 1DL/T5044-2004.电力工程直流系统设计技术规定[S].
  • 2JBT9568-2000.电力系统继电器、保护及自动装置通用技术条件[Z].

共引文献1

同被引文献1

引证文献1

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部