摘要
以武汉市二七路综合公共停车场工程为例,对项目推进中各个设计阶段的任务和控制性因素等进行阐述分析,进一步揭示项目设计过程应注意的问题及发展趋势,同时通过总结项目设计过程中解决问题的方法,为其他项目提供参考。
Taking Wuhan City Erqi Road Comprehensive Public Parking Lot Project as an example, the article sets forth and analyzes the task and control factor of each design stage in the project promotion, further reveals the problems for attention in the design process of projects and the development trend, and sums up the solving problem method in the design process of project, which can be referred for the similar projects.
出处
《城市道桥与防洪》
2014年第12期139-141,15,共3页
Urban Roads Bridges & Flood Control
关键词
工程项目
设计阶段
控制因素
管理
进度
engineering project,design stage,control factor,management,schedule