摘要
结合包头环保发电厂垃圾焚烧发电项目,介绍了垃圾焚烧发电技术的特点。对包头环保发电厂的垃圾焚烧锅炉、垃圾前处理系统、烟气处理系统和渗滤液处理系统进行了分析,并给出上述系统的选型设计推荐方案,同时提出了垃圾焚烧发电厂设计过程中应注意的主厂房防臭问题,可为其他垃圾焚烧发电厂设计提供参考。
The article takes Baotou Green Power Plant as an example, bridfly describes the features and development process of garbage incineration power generation technology, mainly introduces the selection of boiler flue gas treatment, Baotou environmental protection for MSW incineration power plant system and pretreatment system, leachate treatment system, selection of the above attention to the problems about reference for the future design. given system design recommendations and it should pay garbage incineration power design process and give some
出处
《内蒙古电力技术》
2014年第6期55-57,61,共4页
Inner Mongolia Electric Power