期刊文献+

基于逐次DEA的矿产资源开发效率评价 被引量:7

Evaluating Mineral Resources Exploitation Efficiency with Sequential Data Envelopment Analysis
下载PDF
导出
摘要 从劳动力投入、资本投入、土地等自然资源投入,经济效益产出、环境效益产出等方面来构建矿产资源开发评价指标体系。采用逐次数据包络分析(S-DEA)方法来确定各级效率前沿面,实现对各决策单元的矿产资源开发效率的分级划分。以河北省2011年各县区铁矿资源开发效率评价,实例验证了指标体系的可用性与S-DEA方法的有效性。 This study proposes the evaluation index system, considering the labor input, the cap- ital input, the land and other natural resources input, the economic efficiency output and the environ- mental efficiency output. The sequential Date envelopment analysis (S-DEA) is used to identify the sequential efficiency frontiers and classify the decision making units into different exploitation efficien- cy level groups. Finally, the applicability of the evaluation index system and the feasibility of the pro- posed S-DEA method are illustrated by an application case of evaluating the exploitation efficiency of i- ron ore exploitation of the counties in Hebei province.
出处 《管理学报》 CSSCI 北大核心 2015年第2期299-305,共7页 Chinese Journal of Management
基金 国家自然科学基金资助项目(71201110) 河北社会科学基金资助项目(HB12YJ085 HB14GL033) 河北软科学资助项目(13454208D) 河北省教育厅资助重点项目(SD141048) 河北省重点学科技术经济及管理资助项目
关键词 矿产资源开发效率 逐次DEA 效率前沿面 评价指标体系 mineral resources exploitation efficiency sequential data envelopment analysis effi- ciency frontier evaluation indexes system
  • 相关文献

参考文献13

二级参考文献86

共引文献691

同被引文献110

引证文献7

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部