摘要
对烟集河特大桥薄壁空心高墩采用的无支架模板施工技术进行了研究,通过增加模板纵横肋强度加设三角架作业平台,在墩身施工过程中不采用内外支架作为辅助作业平台,利用模板自身特性,满足了高墩施工需要,确保了施工质量及安全。
This paper researched the used without support template construction technology of Yanjihe super bridge thin-wall hollow high pier, through adding template crossbar rib strength added triangular frame work platform,not used the internal and external support as auxiliary work platform in pier construction process,using its own characteristics of template,meet the needs of high pier construction,ensured the construction quality and safety.
出处
《山西建筑》
2015年第3期182-183,共2页
Shanxi Architecture
关键词
空心高墩
无支架
工期
成本
hollow high pier
without support
time limit for a project
cost