摘要
该文以重庆南川名润广场工程的基础工程为例,针对典型的喀斯特地貌岩溶地区的基础设计、施工和勘察等问题进行了分析和研究。溶洞处理准备了多种措施,对岩溶成孔采取了混凝土灌注法等措施,采取了合理的排水措施,保证了桩基础的施工,解决了高层建筑在复杂岩溶地质情况下的基础问题。
Based on the basic Nanchuan Mingrun Plaza project,and the basic design for the typical karst areas,the construction, survey and other issues are analyzed and studied. A variety of measures are prepared for cave treatment, measures like concrete perfusion method for karst pore forming, and reasonable drainage measures are adopted to ensure the pile foundation construction and solve the basic problems of high-rise buildings in complex karst geology.
出处
《重庆建筑》
2015年第1期41-43,共3页
Chongqing Architecture
关键词
喀斯特地貌
岩溶地区
桩基础
混凝土灌注法
Karst landscape
karst areas
pile foundation
concrete perfusion method