3Borys Magdalena, Milosz Marek, Plechawska-Wojcik Malgo- rzata, et al. Using Deming cycle for strengthening coopera- tion between industry and university in IT engineering edu- cation program[C]//2012 15th International conference on in- teractive collaborative learning,2012:l-4.
4Jin I-t ,Huang H ,Dong W, et al.Preliminary experience of a PDCA-cyele and quality management based training curricu- lum for rat liver transplantation [J].Journal of Surgical Re- search: Clinical and Laboratory Investigation,2012,176(2): 409-422.
5余生龙.PDCA管理在医院药学服务中的应用体会[J].医学信息,2015,28(33):236.
6Michiko Tsubaki, Taro Oya, Takahiro Kobayashi, ,et al. Anal- ysis of the design of effective learning activities using learn- ing-type PDCA and CAPD cycles on the basis of the charac- teristics of individual students[J].Intemational journal of knowledge and leaming,2012,8(l/2):150-165.