大跨PC梁式桥长期下挠控制的新方法 被引量:4

A New Method of Long-term Deflection Control of Long-span Prestressed Concrete Beam Bridge
下载PDF
导出
摘要 针对混凝土梁式桥出现不同性质的裂缝和挠度过大的问题,通过研究无应力状态法的原理,结合连续梁一次落架与悬臂施工的力学差异,以某160m跨刚构桥为例,在施工过程以无应力状态法对施工进行控制,结果证明,无应力状态法可以有效减少跨中挠度、墩顶弯矩,对长期下挠控制是有效的,能够为解决大跨梁式桥的挠度问题提供参考。 In order to solve the problems of various cracks and big deflection that happen to concrete beam bridge, the principle of unstressed state method was studied. Combined with the mechanical difference between the construction of formwork and cantilever of the continuous beam, a rigid frame bridge with a span of 160 m was taken to carry out the deflection control with unstressed state method. The result shows that this method can effectively reduce the deflection of mid span and bending moment of the pier top, and is an effective way of long-term deflection control.
出处 《筑路机械与施工机械化》 北大核心 2015年第1期80-82,共3页 Road Machinery & Construction Mechanization
基金 沈阳建筑大学自然科学版一般项目基金(2014086)
关键词 PC梁式桥 下挠控制 无应力状态法 力矩 prestressed concrete beam bridge deflection control unstressed state method moment
  • 相关文献

参考文献4

二级参考文献13

  • 1吴运宏,黄晓航.重庆李渡长江大桥斜拉桥施工监控计算[J].桥梁建设,2006,36(A02):180-182. 被引量:15
  • 2[1]王文涛.刚构-连续组合梁桥[M].人民交通出版社,1993.
  • 3[2]武汉测绘科技大学.测量学(第三版)[M].测绘出版社,1991.
  • 4[3]GB 12897-91,国家一、二等水准测量规范[S].
  • 5黄晓航.武汉白沙洲大桥斜拉桥施工监控[A].中国公路学会桥梁和结构工程学会桥梁学术讨论会论文集[C].2000.409.
  • 6奥登 J T,里帕格 E A.弹性结构力学[M].北京:中国建筑工业出版社,1986.
  • 7中铁大桥勘测设计院有限公司.分阶段施工桥梁的无应力状态控制法与工程实践[Z].2007.
  • 8秦顺全.桥梁施工控制--无应力状态法理论与实践[M].北京:人民交通出版社,2006.
  • 9秦顺全,林国雄.斜拉桥安装计算--倒拆法与无应力状态控制法评述[A].1992年全国桥梁结构学术大会论文集[C].上海:同济大学出版社,1992.569-573.
  • 10秦顺全,谢红兵,刘孝军.武汉长江二桥斜拉桥安装计算及监控管理[J].桥梁建设,1995,25(3):41-43. 被引量:13

共引文献167

同被引文献14

引证文献4

二级引证文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部