本文结合佛山南海万达广场工程实例,通过介绍工程坑中坑施工支护方式、降水措施、土方开挖顺序及现场整体道路规划实施,缩短了施工工期确保施工进度节点,产生了良好的经济效益。
This paper combined with the Foshan Nanhai Wanda Plaza project, through the introduction of the pit in pit supporting construction methods, dewatering measures, sequence of earthwork excavation and the whole road planning, shortened the construction period and ensured the node of construction progress, producing good economic benefits.