摘要 基于现场调查,分析了某水电站层间剪切带特性,总结了其对导流洞稳定性的影响规律。通过数值计算,分析了层间剪切带对左岸中导洞及导流洞的影响,以及对右岸块体稳定性的影响,为确定该水电站导流洞的合适支护方案提供了依据。 Based on field investigation,the characteristics of a hydropower station interlayer shear zone is analyzed and its influence on the stability of the diversion tunnel is summarized.By numerical calculation,the influence of interlayer shear zone on the left bank pilot tunnel and the diversion tunnel are analyzed,as well as the stability of the right bank block.This study provides the basis for determining the appropriate supporting scheme of the diversion tunnel of hydropower stations.
作者 田娇 朱金波
出处 《交通科技》 2015年第1期104-107,共4页 Transportation Science & Technology
关键词 层间剪切带 导流洞 围岩稳定性 interlayer shear zone diversion tunnel the stability of surrounding rock
  • 相关文献

参考文献5

二级参考文献18

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部