摘要
本文介绍了**市地铁一号线建设过程中在工程计量、设计变更及现场签证方面的出现的重点问题,初步分析了产生问题的原因,联系工程实际提出了解决这些问题的措施,旨在为后续线路建设中提供借鉴与参考。
This paper introduces the main problems of the engineering measurement, design change and site access in the construction process of subway line One in a city, preliminary analyzes the causes of the problems. Combined with the engineering practice, it puts forward the measures to solve the problems and offer references for the construction of subsequent lines.
出处
《价值工程》
2015年第9期99-100,共2页
Value Engineering
关键词
地铁
一号线
造价
管理
metro
line One
cost
management