期刊文献+

燃煤锅炉性能监测元件选型及安装的规范化研究 被引量:5

Study on Standardization of Coal-fired Boiler Performance Monitoring Component Selection and Installation
下载PDF
导出
摘要 火力发电机组锅炉测量信号选型及安装的规范性对性能试验和日常监测的精确度具有重要的影响。总结了近年来火力发电机组节能减排工作中涉及锅炉性能监测的一些经验,论述了影响机组性能试验的压力、温度、流量等测点的选型、安装规范和提高精度的方法,使机组在性能试验和日常监测中获得较高品质的数据,为机组的进一步节能、环保工作提供坚实的基础。 As to the performance test before commercial operation and the subsequentperiodic test and the performance monitoring, the normative of the measuring points is very important to the he accuracy of preformance test and the routine monitoring in this article, itanalysis the importance of normalizing measuring points in the system of steam turbine and boilor and low-β pressure nozzle in condenser throat of steam turbine and flow-meteringdevices of feed water. By normalizing the importment measuring points and using high accuracy flow-metering devices, it can improve the accuracy of the performance test andperformance monitoring, and help energy-savingand environmental protection futther.
作者 向丽晖
出处 《锅炉技术》 北大核心 2014年第5期29-31,57,共4页 Boiler Technology
关键词 测量 锅炉性能 给水流量 安装 精度 规范 monitoring boiler performance feeedwater flow installation accuracy standard ization
  • 相关文献

参考文献7

  • 1江浩.一种用于管道流量测量的取压装置:中国2009,20032994.x[P].20102-10.
  • 2江浩.一种用于管道流量装置的管道观察孔:中国2009,20032993.5[P].2010210.
  • 3江浩.用于管道流量测量的一体式取压装置:中国2009,20032992.O[P].2010-210.
  • 4ASME PTC19.5--2004, Flow Measuerment[S].
  • 5ASME PTC6S Report 1988(2003 reaffirmed2003), Proce- dure for Routine Performance Tests of Steam Turbines[S].
  • 6江浩,于新颖,郭俊文,常东锋,王浩,李欣,黄嘉驷,李杨,周元祥,谢天.低β值喉部取压喷嘴在给水流量测量中的应用[J].热力发电,2012,41(10):44-47. 被引量:6
  • 7李珩,江浩.ASME低β值喉部取压喷嘴的校验和评价[J].热力发电,2008,37(12):13-16. 被引量:3

二级参考文献11

  • 1ASME/ANSI. PTC6 - 2004 Performance Test Code 6 On Steam Turbines[S].
  • 2ASME. PTC19.5 - 2004 ,Flow Measurement[S].
  • 3GB/T2624-93流量测量节流装置-用孔板喷嘴和文丘里管测量充满圆管[S].北京:中国标准出版社,1993.
  • 4ASME/ANSI.Flow Measurement[].PTC.2004
  • 5Measurement of flow by means ofpressure differential devices inserted in circular crosssec-tion conduits running full—Part 2:Orifice plates. BS EN ISO 5167-2 . 2003
  • 6.Performance Test Code 6OnSteam Turbines[].ASME/ANSIPTC—.
  • 7.Proce-dure for Routine Performance Tests of Steam Turbines[].ASME PTCSReport- (reaffirmed).
  • 8B Bornstein,K C Cotton.A Simplified ASME AcceptanceTest Procedure for Steam Turbines[].Transactions ofthe ASME-Journal of Engineering for Power.1982
  • 9Benedict R P.Generalized Fluid Meter Discharge Coeffi-cient Based Solely on Boundary Layer Parameters[].ASME Journal of Engineering for Gas Turbines and Power.1979
  • 10Murdock,Keyser.Theoretical Basis for Extrapolation ofCalibration Data of PTC6Throat Tap Nozzles[].Journalof Engineering for Gas Turbine and Power.1991

共引文献6

同被引文献16

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部