摘要
以新余铁坑矿业浮选厂房改扩建工程为例,对原有厂房进行了加固设计,并阐述了砖柱加固设计、砖柱基础加固设计、屋面梁与原有厂房柱连接设计方法,同时提供了验算参数对加固部位进行鉴定,经鉴定满足设计要求,该厂房改扩建取得了显著的经济效益。
Taking the flotation selection plant expansion reinforcement engineering of Xinyu iron pit mining as an example, made reinforcement design to original plant, and elaborated the brick column reinforcement design, brick column foundation reinforcement design, roofing beam and original plant column connection and design method, at the same time provided checking parameters identification to reinforcement part, through the identification meet the design requirements, the plant expansion gained remarkable economic benefits.
出处
《山西建筑》
2015年第4期23-24,共2页
Shanxi Architecture
关键词
厂房改扩建
加固设计
鉴定
结构
plant expansion, reinforcement design, identification, structure