通过对西南地区多个建筑工程项目支挡方案的介绍,总结了建筑物"吊层"或"吊脚"后,单面或多面挡土而形成的不平衡土压力的处理方法及关键控制点,以供类似工程参考借鉴。
According to the introduction of the retaining scheme for many architectural engineering programs in the southwest areas, the paper sums up the treatment methods and key controlling points for the unbalanced soil pressure caused by single-plate and many-side retaining soils after "hoisting layer" or "uneven legs" of buildings, so as to provide some reference for similar projects.
出处
《山西建筑》
2015年第4期86-87,共2页
Shanxi Architecture
关键词
吊层
吊脚
边坡
土压力
支挡方案
hoisting layer, uneven leg, slope, soil pressure, retaining scheme